Buying or Renovating a Mansion Flat in Kensington, Knightsbridge and Mayfair: Licence to Alter, Building Safety, Stalled Projects and the First 90 Days

Renovating a mansion flat in Kensington, Knightsbridge or Mayfair: the short answer.
The building decides more of the project than the budget does. Before design starts, four things have to be settled:
What the lease and the Licence to Alter allow. This covers layout, flooring, air conditioning, pipework, working hours and scaffolding.
Which building control route applies. Many Edwardian mansion blocks of seven storeys or 18 metres and above are now higher-risk buildings under the Building Safety Act, and that changes who approves your works and how long it takes.
What the fire strategy requires. This matters most for open-plan living and kitchen layouts.
What the building fabric is really like. Windows, leaks from above, electrical capacity and the true finished ceiling height.
Costs follow our House and Flat Renovation Cost in London guide: £350–£550 per sq ft for a full renovation, £550–£750high-end, £750–£1,200+ ultra-prime. A full renovation typically takes 24–36 weeks on site, after 4–10 weeks of Licence to Alter (often 6–16 weeks in prime mansion blocks).
The most expensive mistakes we see aren’t about finishes. A project starts on drawings the licence never approved, on the wrong building control route, or with five consultants who each have a different version of the flat. We take on that kind of project, including ones another team has left half-finished, and deliver them under one contract.
If you’re buying, or your project has stalled, message us on WhatsApp or email design@kapeti.com. We work in English, Turkish and Arabic.
WHO THIS GUIDE IS WRITTEN FOR
Buyers about to exchange on a flat in Kensington (W8), Knightsbridge (SW1X, SW7, SW3), Mayfair (W1K, W1J), Marylebone or Bayswater (W2)
Owners who want to renovate a mansion flat they already own
Families and family offices whose renovation has stalled: a contractor has left, the licence and drawings no longer match, or building control has raised questions nobody is answering
Anyone looking for an architect, interior designer or project manager for a flat renovation in central London who isn’t sure which of them they actually need
If you’re planning a high-end or ultra-prime finish, read this together with Luxury Flat Renovation in Mayfair and Knightsbridge. For Chelsea, South Kensington, Belgravia and Pimlico, see our local guide.
TABLE OF CONTENTS
Why mansion flats are a different kind of project
Before you buy: the pre-purchase checks
Licence to Alter: what it actually approves
Building control and the Building Safety Act
Fire safety in open-plan flats
Period windows: repair, upgrade or replace
The hidden constraints nobody mentions at viewing
Taking over a stalled or troubled project
Architect, interior designer, project manager or design and build?
The first 90 days
What it costs
Two projects from our work
Frequently asked questions
What to do next
1. WHY MANSION FLATS ARE A DIFFERENT KIND OF PROJECT
A house belongs to you. A flat in a mansion building belongs to a system: a freeholder, often a great estate or a residents’ management company, a managing agent, a porter or concierge, a building surveyor acting for the landlord, sometimes a superior landlord, a local authority, and 20 to 60 neighbours.
Every one of them can slow your project down, and most can stop it.
In Kensington, Knightsbridge and Mayfair the typical building is an Edwardian or late-Victorian mansion block. It has generous ceilings, beautiful bay windows and solid floors, and it also has ageing risers, original timber windows, restrictive leases and, increasingly, a place on the higher-risk building register. The architecture is what makes these flats worth owning. The system around them is what makes them hard to renovate.
A good renovation here starts with the building and moves on to design afterwards.

2. BEFORE YOU BUY: THE PRE-PURCHASE CHECKS
Most of these can be answered before exchange, by your solicitor, the managing agent, and a technical walk-round with the team who’ll deliver the work.
Check | Why it matters | What to ask for |
Alterations clause in the lease | Sets what you can change at all: layout, wet rooms, floors, services | Full lease and any deeds of variation |
Existing Licence to Alter | A licence approves specific drawings. If a previous owner obtained one, it may not match the scheme you want | Licence, approved drawings and its schedule of conditions |
Air conditioning | Many leases prohibit external condensers, or AC altogether | The lease clause and any building policy |
Flooring and acoustics | Hard floors often require an acoustic build-up and a post-completion sound test | Building regulations for floors; acoustic test requirement |
Working rules | Hours, quiet periods, Christmas and summer shutdowns, lift booking, scaffolding requirements | Building rules or contractor’s code from the managing agent |
Higher-risk building status | Decides your building control route and can add months | Check the Building Safety Regulator’s public register |
Listed or conservation status | Windows, plasterwork, joinery and external changes may need consent | Planning history from the council (RBKC or Westminster) |
Electrical supply | Older flats often have a single-phase supply that limits UFH, induction and cooling | Supply rating at the meter (e.g. 60A, 80A, 100A) |
Windows | Original timber windows in poor condition can be a five or six-figure item | Condition survey; any planning or licence history |
Signs of water ingress | Leaks from above or from the roof are the freeholder’s problem, but they will stop your works | Damp readings; ceilings in kitchens, bathrooms and plant areas |
Previous works and sign-offs | Incomplete building control files, missing structural certificates and unfinished work become yours | Building control completion certificates; structural calcs |
How long the flat has been empty | Renovating a home empty for two years or more can qualify for 5% VAT instead of 20% | Council tax and utility records showing the empty period |
That last line alone can save tens of thousands of pounds on a major renovation. It has to be evidenced before contract, not argued about afterwards.
If you’re about to exchange and want a technical view of a flat, send us the particulars on WhatsApp. We often turn round an initial view within 48 hours.
3. LICENCE TO ALTER: WHAT IT ACTUALLY APPROVES
A Licence to Alter is the landlord’s written consent to your works. It isn’t a formality, and it isn’t a general permission.
What owners often don’t realise:
It approves a set of drawings, not an idea. If your designer later changes the layout, the services or the floor build-up, the new drawings aren’t covered. That can mean a variation and fresh fees.
It comes with conditions. Common ones are soldered copper pipework rather than push-fit, an acoustic test after completion, scaffolding for any window or external work, no works over Christmas, a landlord’s surveyor inspecting at set stages, and as-built drawings and certificates at the end.
It can expire, or be overtaken. A licence obtained years ago for a previous scheme may still be valid in law but useless in practice if the design has moved on.
The landlord’s surveyor reviews what they’re sent. Packages they never received aren’t approved, however good they are.
Timescales and costs (consistent across our guides):
Typical: 4–10 weeks, £3,000–£15,000 in landlord’s legal and surveyor’s fees
Prime mansion blocks and great estates: 6–16 weeks, £5,000–£20,000+
How we handle it: we design to the licence from the start. Before any drawing is issued, we read the lease, the existing licence and its conditions, and design the services and floor build-ups to comply. Where a client wants something the licence doesn’t allow, we say so in week one, not after the stone has been ordered.
4. BUILDING CONTROL AND THE BUILDING SAFETY ACT
Is your building “higher-risk”?Under the Building Safety Act, a building of at least 18 metres or seven storeys with at least two residential units is a higher-risk building (HRB). A large number of Edwardian mansion blocks in Kensington, Knightsbridge, Marylebone and Mayfair meet that test. Their status is on the Building Safety Regulator’s public register.
Why it matters for your flat:
Building control for work in an HRB is generally handled by the Building Safety Regulator (BSR), not a private approved inspector or the council
Works need approval before they start, known as Gateway 2. The statutory target for work to existing HRBs is eight weeks, but in practice applications have often taken considerably longer
The building has a principal accountable person, often a residents’ management company and not the landlord, who has a legitimate interest in your works
The client must appoint a competent principal designer and principal contractor for building regulations purposes
Transitional projects. Some projects with a building control notice lodged before the new regime came in may remain with their original building control body. Whether yours does is a factual question. Get it confirmed in writing by building control before you sign a fixed-price, fixed-date contract or pay deposits. On one of our current Kensington projects, that single written confirmation was the difference between starting in weeks and waiting months.
Our approach: we establish the building control route at the very start, and we keep one channel of communication with building control. Mixed messages from several consultants are the fastest way to turn a routine file into a problem.
5. FIRE SAFETY IN OPEN-PLAN FLATS
Open-plan kitchen and living spaces are what most families want, and in a flat they’re exactly where building control will look hardest.
Typical requirements in a mansion flat:
A protected entrance hall as the escape route, with walls taken up to the slab
FD30 fire doors with intumescent seals and self-closers onto that hall
Fire-rated plasterboard to ceilings and partitions where required, and exposed structural steel enclosed in fire board or intumescent paint
For large open-plan spaces where the escape distance or room size exceeds the guidance, a fire-engineered solution. In practice that usually means:
a watermist suppression system covering the living space and often the hall, or
a fire-rated partition and door between kitchen and living, or
a fire curtain, which is effective but costly and often unpopular aesthetically
A fire engineer’s report setting out the strategy for building control
A watermist system for a single flat is often in the region of £6,000–£15,000 installed, depending on coverage, plus the fire engineer’s fee. That’s far less than redesigning the layout late in the project. The key is to decide the fire strategy with the design, not after building control rejects the drawings.
6. PERIOD WINDOWS: REPAIR, UPGRADE OR REPLACE
Original timber windows in Kensington and Knightsbridge mansion blocks are often over a century old. Many have curved bays, slender glazing bars and casements that no longer close properly.
The three options:
Option | What it involves | Typical cost (large mansion flat) | When it’s right |
Repair and draught-proof | Overhaul frames, new ironmongery, seals, redecoration | £15,000–£35,000 | Frames are sound, budget is tight |
Repair + slim double glazing | Keep frames, replace glass with slim double-glazed units, overhaul | £30,000–£70,000 | Frames are repairable; heritage character matters |
Like-for-like replacement | New timber windows replicating profiles, including curved bays | £60,000–£140,000+ | Frames are rotten or deformed beyond repair |
Points that catch owners out:
Curved bay windows need curved glass, and not every manufacturer can supply it. It adds both cost and lead time
Scaffolding is often a licence requirement for window work, typically £10,000–£25,000 depending on elevation and duration
Listed or conservation status may need consent; like-for-like replacement is usually the easiest route
Building control may accept replacements installed under a competent person scheme such as FENSA, with restrictors on low-cill opening casements
Window lead times of 8–16 weeks mean the decision has to be made early, because heating design depends on it
Original windows are part of what makes these flats beautiful, so we never treat them as just a line item.

7. THE HIDDEN CONSTRAINTS NOBODY MENTIONS AT VIEWING
Your ceiling height will drop. A flat with 3.15 metres slab to slab may finish at around 2.85 metres: roughly 14–17 cm goes into an acoustic floor with underfloor heating, and up to 15 cm into a ceiling void for services and lighting. That’s still generous, but you need to know it before you fall in love with the drawings.
Air conditioning may not be possible. If the lease prohibits it, the options are limited to portable units, and even those need the electrical supply checked.
The electrical supply may be the limit. Underfloor heating, an induction hob, steam ovens, a 200-litre cylinder and portable cooling all compete for the same supply. Check it before you choose them.
Leaks from above are common. Old roofs, terraces and risers leak. If you find water ingress, report it to the managing agent in writing before your works begin, with photographs, so it can’t later be blamed on your renovation.
Walk-in showers need drainage that works. Level-access showers depend on falls and existing drainage positions. Many can be built flush; some need a raised platform. Check on site, not on paper.
Services often have to follow the licence. That can mean soldered copper, specific ventilation routes, and no new penetrations through party walls or the external façade.
Things go missing. Intercom handsets, meters and isolators sometimes disappear in previous strip-outs and never make it onto the drawings or the budget.
8. TAKING OVER A STALLED OR TROUBLED PROJECT
A surprising share of our enquiries in Kensington and Knightsbridge are projects that started with someone else.
The signs a project has stalled:
A contractor has left, or the works have been stripped out and stopped
The drawings, the Licence to Alter and the building control file no longer agree
There are several consultants (architect, interior designer, M&E engineer, project manager, quantity surveyor) and each has a different version of the flat
Building control has raised questions about fire, structure or windows that nobody owns
The owner lives abroad and hears about problems weeks late
How we take one over:
Technical audit (one to three weeks): we read the lease, the licence and its approved drawings, the building control correspondence and the structural file. Then we inspect the site to see what has actually been built, what’s missing and what’s still open, such as welding certificates, lintel calculations or uncertified steel.
One version of the truth: a single scheme that complies with the licence and building control, with every deviation from earlier consultants’ drawings listed and explained.
One channel of communication with the landlord, the managing agent and building control. Owners’ representatives can stay informed as observers; they shouldn’t run a parallel conversation.
One contract: design, approvals, construction, joinery and furnishing, with a fixed price, a programme and a payment schedule tied to it.
Clear reporting to the owner wherever they are. See Renovating a London Property Without Being There.
Projects stall because nobody holds the whole thing. The fix is to make one team responsible for it.
If your renovation has stalled, message us on WhatsApp. An initial review of where the project stands is free.
9. ARCHITECT, INTERIOR DESIGNER, PROJECT MANAGER OR DESIGN AND BUILD?
People searching for “an architect for a flat renovation in Kensington” usually need something slightly different.
A chartered architect is essential for new buildings, extensions, façade changes and complex planning applications.
For the internal renovation of a flat, which is most mansion-flat projects, what you need is:
an interior architecture and design lead who plans layouts, services and finishes to the licence
the technical drawings for the Licence to Alter and building control
specialist engineers (structural, fire, M&E) appointed and coordinated
someone to act as principal designer under building regulations
a construction team that builds what was designed
project management that keeps the landlord, the managing agent, building control and the neighbours on side
You can appoint each of these separately, or you can appoint one practice that does all of them.
Kapeti is an interior architecture and design-and-build practice. We lead the design, take on the principal designer role, bring in and coordinate the specialist engineers, deliver the construction through our own London team, manufacture bespoke joinery and furniture through our partners in Türkiye, Portugal and Poland, and hand over a finished, furnished and certified home.
One team. One contract. No handovers. No surprises.
10. THE FIRST 90 DAYS
From the day you complete on the purchase, or appoint us, a realistic sequence looks like this:
Weeks | What happens |
0–2 | Measured or laser survey; lease, licence and building control review; condition checks on windows, services and water ingress |
2–6 | Concept design and budget; fire strategy and building control route agreed; windows decision |
4–10 | Licence to Alter application (6–16 weeks in prime mansion blocks); building control submission |
6–12 | Technical design and specification; sample approvals; joinery and stone drawings |
8–14 | Contract signed; long-lead items ordered and manufactured in parallel (windows, joinery, stone, doors) |
12–16 | Start on site, once the licence and building control route are confirmed |
From there, a full renovation of a two to four-bedroom mansion flat is typically 24–36 weeks on site. In total, expect roughly 9–13 months from completion of purchase to moving in, and longer for listed or higher-risk buildings needing Gateway 2 approval.
11. WHAT IT COSTS
Construction costs per sq ft, consistent with our House and Flat Renovation Cost guide:
Level | £ per sq ft | Two-bed (1,000–1,300 sq ft) | Four-bed (1,800–2,200 sq ft) |
Full renovation | £350–£550 | £350,000–£715,000 | £630,000–£1.2M |
High-end | £550–£750 | £550,000–£975,000 | £990,000–£1.65M |
Ultra-prime | £750–£1,200+ | £750,000–£1.56M | £1.35M–£2.6M+ |
Listed building | £550–£900+ | £550,000–£1.17M | £990,000–£1.98M |
Building-specific costs that are often missed:
Item | Typical range |
Licence to Alter (landlord’s legal and surveyor’s fees) | £3,000–£20,000+ |
Building control fees | £2,000–£8,000 |
Fire engineer’s report | £2,500–£6,000 |
Watermist suppression (where required) | £6,000–£15,000 |
Period window works | £15,000–£140,000+ |
Scaffolding (if required) | £10,000–£25,000 |
Acoustic testing | £1,000–£3,000 |
Surveys (measured, laser, structural, asbestos) | £3,000–£12,000 |
VAT | 20%, or 5% where the home has been empty for 2+ years and the evidence supports it |
12. TWO PROJECTS FROM OUR WORK
Anonymised, with details rounded.
A stalled mansion flat in Kensington, W8 (current project)
An Edwardian mansion building on the higher-risk building register; a four-bedroom flat of around 1,900 sq ft with 3.15 m ceilings and curved bay windows
The owner, an international family, found us through AI-assisted research. Years earlier they had obtained a licence for an earlier design. A previous contractor had left after strip-out, and a full team of consultants had since produced drawings that no longer matched the licence or each other
What we did: audited the licence against every drawing package and built the scheme back to what the landlord had actually approved. We had building control confirm the route in writing, which kept the project with its existing building control body. We solved the open-plan fire requirement with watermist to the living area and hall, an FD30 kitchen door and fire-rated boarding instead of a fire curtain. We set out repair-and-glazing and full-replacement options for the windows, including the curved bays. We made the true finished ceiling height clear before design sign-off, reported water ingress from above to the managing agent before works began, and issued a specification register with certification for every product manufactured in Türkiye
Underfloor heating throughout, an acoustic floor system, Lutron lighting control and bespoke joinery
On site from autumn 2026, with completion planned for mid-2027. Afterwards the owner asked us to assess a second flat in the same building
Two identical flats in one Mayfair building (2023)
Two three-bedroom flats in the same building, bought by the same family based between Dubai and the USA; one renovated by Kapeti, the other by a different contractor
Scope for ours: refurbishment without structural change (kitchen, bathrooms, joinery and finishes) with everything prepared before submission, so the managing agent could turn the Licence to Alter around in about two weeks
Our flat was completed in around 12 weeks. Eight months later, the other flat was still unfinished
Same building, same rules, same scope. The difference was preparation and one accountable team

13. FREQUENTLY ASKED QUESTIONS
How much does it cost to renovate a flat in Kensington or Knightsbridge?
A full renovation typically costs £350–£550 per sq ft in 2026, high-end £550–£750 and ultra-prime £750–£1,200+. A two-bedroom flat of 1,000–1,300 sq ft is usually £350,000–£715,000 for a full renovation, before furniture, building-specific costs and VAT.
How long does a Licence to Alter take in a mansion block?
Typically 4–10 weeks, and often 6–16 weeks in prime mansion blocks and great-estate buildings. Fees usually run from £3,000 to £15,000, and up to £20,000 or more in prime buildings.
What is a higher-risk building and does it affect my flat renovation?
A building of at least 18 metres or seven storeys with at least two homes is a higher-risk building under the Building Safety Act. Work inside it generally needs Building Safety Regulator approval before starting, which adds time. Some projects started under the earlier regime remain with their original building control body. Confirm the route in writing before you sign.
Can I have an open-plan kitchen in a mansion flat?
Often yes, with the right fire strategy: a protected entrance hall, FD30 doors and, for larger open-plan spaces, a fire-engineered solution such as watermist suppression, supported by a fire engineer’s report.
Can I install air conditioning in a Kensington or Knightsbridge mansion flat?
Only if the lease and the freeholder allow it, and many prohibit it. Check before you buy, and check the electrical supply even for portable units.
Should I replace or repair my period windows?
If the frames are sound, repair with slim double glazing keeps the character at a lower cost. If they’re rotten or deformed, like-for-like replacement is usually the right answer, and curved bays need a specialist manufacturer.
Can renovation VAT be reduced to 5%?
Where a home has been empty for at least two years, qualifying renovation work can be charged at 5% VAT instead of 20%. You’ll need evidence of the empty period, and it should be confirmed before the contract is signed.
Do I need an architect to renovate my flat in London?
For internal renovation of a flat, usually not a chartered architect. You need an interior architecture and design lead, technical drawings for the licence and building control, coordinated engineers, a principal designer and a construction team. A design-and-build practice like Kapeti provides all of these under one contract.
Can you take over a renovation another contractor has left?
Yes. We start with a technical audit of the licence, the drawings, the building control file and the site, then deliver the project under one contract.
Can I manage the renovation from abroad?
Yes. Many of our clients do. See Renovating a London Property Without Being There.
14. WHAT TO DO NEXT
If you’re buying a flat in Kensington, Knightsbridge, Mayfair or nearby, or your renovation has stalled, start with a private conversation.
We’ll review the lease, the licence, the building and what you want to achieve, and give you an honest view of what’s possible, what it will cost and how long it will take.
One team. One contract. No handovers. No surprises.The first conversation is free. No cost, no obligation.
📲 WhatsApp: +44 7342 240695 (English, Turkish, Arabic)✉️ Email: design@kapeti.com📍 Cornwall Mansions, Cremorne Road, London SW10
RELATED GUIDES
SERVICE PAGES
Servet Yuksel is a BIID Registered Interior Designer and Managing Director of Kapeti Interior Architecture, a design and build practice based in Chelsea, London. Since 2014 across London and Istanbul, and with Kapeti in London since 2019, the practice has delivered more than 50 residential, hospitality and commercial projects, including period and mansion-block homes for international families, with bespoke joinery, stone and furniture produced through manufacturing partners in Türkiye, Portugal and Poland.