top of page
Search

How Much Does a Restaurant Fit-Out Cost in London? The Definitive 2026 Guide

Writer: Servet Yuksel
Servet Yuksel
Mar 14
12 min read

Updated: Sep 29

A realistic guide for restaurant owners / By Servet Yuksel — BIID Registered Interior Designer, Managing Director of Kapeti Interior Architecture


A restaurant fit-out in London costs £180–£450 per sq ft for the customer-facing areas in 2026, and £400–£1,000+ per sq ft for the kitchen. Blended across a whole unit, most London restaurants land between £220 and £400 per sq ft.

In practice that means:

  • Small restaurant or café-restaurant (1,200–2,000 sq ft): £250,000–£700,000

  • Mid-size restaurant (2,500–3,500 sq ft): £500,000–£1.2M

  • Large or signature restaurant (4,000–6,000 sq ft): £900,000–£2M+

These are fit-out figures — construction, kitchen infrastructure, joinery and finishes. Kitchen equipment, FF&E, professional fees and VAT sit on top, and usually add 40–70% to the fit-out figure.

The number that surprises most operators is not the dining room. It is the kitchen, the extraction and the condition of the unit on the day you sign the lease. This guide explains why, with real ranges for each.

If you'd rather have a number for your own unit than read the full guide, send us the details on WhatsApp or email design@kapeti.com — the first conversation is free.


WHO THIS GUIDE IS WRITTEN FOR

  • Restaurateurs and chef-founders budgeting a new site in London

  • Investors reviewing a restaurant business plan who need to test the fit-out line

  • Operators refurbishing an existing restaurant that has lost its edge

  • Anyone who has received two fit-out quotes that are £200,000 apart and wants to understand why

If you are also planning the wider opening budget — staff, marketing, working capital — read this alongside Opening a Restaurant in London: The Definitive Investor's Guide.



TABLE OF CONTENTS

  1. Restaurant fit-out cost per sq ft — by specification

  2. Cost by type of restaurant

  3. The single biggest variable: the condition of the unit you sign

  4. The complete cost breakdown — where every pound goes

  5. The kitchen — why it costs more per sq ft than anything else

  6. Extraction, gas and drainage — the hidden deal-breakers

  7. How location changes the number

  8. What sits outside the fit-out quote

  9. Where the genuine savings are — and where they are not

  10. Three representative project profiles

  11. How to sense-check a restaurant fit-out quote

  12. Frequently asked questions

  13. What to do next

1. RESTAURANT FIT-OUT COST PER SQ FT — BY SPECIFICATION

The figures below are for London and the immediate surrounding area in 2026, covering construction, MEP, joinery, finishes and kitchen infrastructure. They exclude kitchen equipment, loose furniture, professional fees and VAT.

Specification

Customer areas (per sq ft)

Kitchen (per sq ft)

Blended across unit

Casual / high-street

£180–£250

£400–£600

£220–£300

Mid-market

£230–£320

£450–£700

£260–£350

Premium neighbourhood

£300–£420

£550–£850

£320–£420

Signature / fine dining

£420–£700+

£700–£1,000+

£450–£750+

Why the kitchen costs two to three times more per sq ft: it is the densest part of the building. Extraction, fire suppression, gas, three-phase power, drainage with grease management, hygienic wall and floor finishes, cold rooms and specialist ventilation all sit inside a small footprint. A 500 sq ft kitchen can easily cost as much as a 1,500 sq ft dining room.

A useful rule: the more of your floor area is kitchen, the higher your blended cost per sq ft — which is why a heavy-cooking concept on a small footprint often costs more per sq ft than a larger, lighter one.


2. COST BY TYPE OF RESTAURANT

Concept drives cost more than size. The same 2,500 sq ft unit costs very different amounts depending on what it has to become.

Restaurant type

Typical size

Typical fit-out cost

What drives it

Café-restaurant / all-day

1,000–2,000 sq ft

£200,000–£500,000

Coffee and light kitchen, strong front-of-house joinery

Fast-casual / counter service

1,200–2,500 sq ft

£250,000–£550,000

Efficient kitchen line, durable finishes, branding

Neighbourhood restaurant

2,000–3,000 sq ft

£450,000–£900,000

Full kitchen, bar, 70–120 covers, warmth and acoustics

Grill, steak or charcoal-led

2,500–4,000 sq ft

£650,000–£1.4M

Heavy extraction, charcoal or solid-fuel equipment, fire strategy

Bar-led restaurant / cocktail

2,000–3,500 sq ft

£550,000–£1.2M

Large bar joinery, back-bar, ice and glasswash, lighting

Signature / fine dining

3,000–6,000 sq ft

£1.2M–£2.5M+

Bespoke everything, chef's kitchen, acoustic and lighting design

Hotel or pub restaurant

Varies

See our guides

Shared services, licensing and operator standards



3. THE SINGLE BIGGEST VARIABLE: THE CONDITION OF THE UNIT YOU SIGN

Two restaurants with identical designs can differ by £300,000 purely because of the unit they started in. Before comparing any quotes, identify which of these four starting points you are in.

Starting condition

What it means

Effect on cost

Existing restaurant, being refreshed

Kitchen, extraction and services already in place and usable

Lowest — often £150–£250/sq ft blended

Second-hand restaurant premises

Previous restaurant, but services need upgrading for your concept

Moderate — reuse saves money if the extraction and gas genuinely suit

Cat A or retail unit, no restaurant history

Clean shell, but no extraction route, no gas, no grease drainage

High — expect £80,000–£250,000 extra for the infrastructure alone

Bare shell / new-build (shell & core)

Concrete floor, capped services, sometimes no ceiling or shopfront

Highest — everything is new, including floors, ceilings and often the shopfront

The most expensive surprise in London restaurant fit-out is signing a unit that looks ready, then discovering the extraction cannot be routed to roof level, the landlord no longer permits gas, or the drainage cannot handle a commercial kitchen. A pre-lease technical survey costing a few thousand pounds regularly saves six figures. We carry these out routinely before clients sign — it is the most valuable hour of the whole project.

For units in mixed-use and taller buildings, also read Commercial Fit-Outs in High-Risk Buildings: Critical Decision-Making for Investors.



4. THE COMPLETE COST BREAKDOWN — WHERE EVERY POUND GOES

A realistic 2026 breakdown for a 3,000 sq ft mid-market-to-premium restaurant at a blended £330 per sq ft (roughly 2,300 sq ft customer and bar areas, 700 sq ft kitchen and back-of-house).

Cost category

% of fit-out

£ on a £990,000 fit-out

Strip-out, surveys, preparation

4%

£39,600

Structural works and openings

5%

£49,500

Kitchen infrastructure (extraction, suppression, gas, drainage, finishes)

16%

£158,400

Mechanical and electrical — dining, bar, WCs

15%

£148,500

Bar joinery and back-bar

8%

£79,200

Fixed seating, banquettes and bespoke joinery

10%

£99,000

Ceilings, flooring and wall finishes

9%

£89,100

Lighting design and installation

6%

£59,400

WCs and accessible facilities

4%

£39,600

Shopfront, signage and entrance

4%

£39,600

Acoustic treatment

3%

£29,700

Preliminaries, project management and supervision

11%

£108,900

Contingency

5%

£49,500

Total fit-out

100%

£990,000

Kitchen infrastructure and MEP together are over 30% of the fit-out — and none of it is visible to guests. This is why restaurants that budget from photographs of other restaurants almost always underestimate.



5. THE KITCHEN — WHY IT COSTS MORE PER SQ FT THAN ANYTHING ELSE

The kitchen is where a restaurant makes or loses money every service, and it is where most fit-out budgets are won or lost too.

Kitchen infrastructure (part of the fit-out):

  • Extraction canopy, ductwork to roof, fans and attenuation

  • Fire suppression system over the cooking line

  • Gas supply, interlocks and commissioning — or upgraded electrical supply for an all-electric kitchen

  • Drainage with grease management

  • Hygienic wall and floor finishes, coving, stainless steel

  • Make-up air and kitchen ventilation

  • Walk-in cold rooms

Kitchen equipment (usually separate from the fit-out):

Kitchen scale

Typical equipment cost

Light kitchen (café, counter)

£30,000–£70,000

Full restaurant kitchen (70–120 covers)

£80,000–£180,000

High-output or specialist (charcoal, wood-fired, large covers)

£150,000–£400,000+

The decision that saves the most money is made before any drawing: matching the kitchen to the menu. An oversized kitchen wastes capital and floor area that could hold covers. An undersized one caps revenue for the life of the lease. Kitchen layout, equipment and service flow should be decided with the chef, not handed to an equipment supplier after the interior is designed.

At Kapeti, commercial kitchens are a core specialism — operational decisions are made in-house with the operator, and a dedicated kitchen consultant prepares the systems drawings. Kitchen and interior are designed as one, which is where most coordination costs disappear.



6. EXTRACTION, GAS AND DRAINAGE — THE HIDDEN DEAL-BREAKERS

Three technical questions decide whether a unit can host your concept at all, and each can move the budget by tens of thousands of pounds.

Extraction. A full cooking kitchen needs ductwork discharging at roof level, often through residential floors above. A new external or internal riser can cost £40,000–£150,000+, and in some buildings it is not permitted. Recirculating filtration systems can solve this for some menus, but they limit high-heat, charcoal and open-flame cooking.

Gas. Many London landlords no longer permit new gas installations. A new gas supply, where allowed, can cost £10,000–£40,000. The alternative — an all-electric kitchen — usually needs a significant electrical upgrade, sometimes £15,000–£60,000 if a new supply is required.

Drainage. Commercial kitchens need adequate falls and grease management. Discovering during strip-out that the drainage is inadequate is one of the most common mid-project extras.

Our advice is simple: get these three answered in writing before you sign the lease. If the agent or landlord cannot answer them, commission a survey.



7. HOW LOCATION CHANGES THE NUMBER

The same restaurant costs different amounts across London, mostly because of access, building stock and landlord requirements.

Area

Effect on fit-out cost

Why

Mayfair, St James's, Marylebone, Knightsbridge

+15–25%

Listed buildings, restricted servicing, premium expectations

Soho, Covent Garden, Fitzrovia

+10–20%

Tight access, older buildings, residential neighbours, night working

City and Canary Wharf

+5–12%

Landlord standards, out-of-hours working, modern but controlled buildings

Chelsea, Kensington, Notting Hill, Fulham

+8–15%

Period buildings, conservation areas, residential above

Shoreditch, Islington, Clapham, Brixton

0 to +10%

Mixed stock, often converted industrial or railway arches

Outer London and Home Counties

−10 to −20%

Easier access and logistics, simpler buildings



8. WHAT SITS OUTSIDE THE FIT-OUT QUOTE

A fit-out quote is not a restaurant budget. These are almost always separate:

Item

Typical range (mid-size restaurant)

Kitchen equipment

£80,000–£180,000

Loose furniture, tableware and glassware

£40,000–£120,000

Professional fees (design, MEP, structural, fire, CDM) in a traditional model

8–15% of fit-out

Licensing, planning and legal

£15,000–£60,000

Building Control, landlord surveyor and Licence to Alter fees

£5,000–£25,000

POS, booking and IT hardware

£15,000–£40,000

VAT

20% on almost everything

Rule of thumb: a £600,000 fit-out quote usually becomes a £900,000–£1M+ project once equipment, furniture, fees and VAT are added. None of this is hidden — it is simply not in the fit-out line. Budget it from day one.



9. WHERE THE GENUINE SAVINGS ARE — AND WHERE THEY ARE NOT

Real savings

  • Design and build under one contract. No redesign cycle between designer and builder, no variation claims for things the drawings did not foresee, one party accountable for cost and programme. Typically 10–15% lower total cost on restaurant projects, with far better programme certainty. This is how Kapeti works — one team, one contract, no handovers, no surprises.

  • Bespoke joinery manufactured through specialist partners. Bars, banquettes, back-bar, shelving and fixed seating are a large share of any restaurant's character and budget. Manufacturing through our partners in Türkiye, Portugal and Poland typically saves 25–45% on the joinery line, designed in London, specified to UK standards and installed by our own team.

  • Choosing the right unit. A second-hand restaurant premises with extraction and gas that genuinely suit your concept can save £100,000–£250,000 against a bare shell.

  • Matching the kitchen to the menu. Right-sized equipment and layout save capital and floor area.

False savings

  • The cheapest quote. Restaurant quotes vary mainly on scope, exclusions and provisional sums, not efficiency. The cheapest quote tends to become the most expensive project.

  • Cutting acoustics. A loud dining room shortens dwell time and damages reviews for years.

  • Cheap lighting. It is the fastest way to make a premium interior look ordinary.

  • Skipping the pre-lease survey. The most expensive few thousand pounds you can save.

For the full selection framework, see How to Choose a Restaurant Fit-Out Contractor in London.





10. THREE REPRESENTATIVE PROJECT PROFILES

The profiles below are representative of projects in our recent portfolio and current tenders, anonymised and rounded. They show how starting condition and concept move the number.

Profile A — Neighbourhood restaurant, South West London

  • Around 2,200 sq ft, 80 covers, second-hand restaurant premises

  • Existing extraction route reused and upgraded; new kitchen line and bar

  • Fit-out: approx. £500,000 (about £227/sq ft blended)

  • Kitchen equipment: approx. £85,000 · FF&E: approx. £70,000

  • On site: 14 weeks

Profile B — Premium Mediterranean restaurant and bar, West End

  • Around 3,400 sq ft on a Cat A shell with residential floors above

  • New extraction riser to roof, all-electric kitchen with electrical upgrade, large bespoke bar

  • Fit-out: approx. £1,050,000 (about £309/sq ft blended)

  • Kitchen equipment: approx. £160,000 · FF&E: approx. £140,000

  • On site: 20 weeks

Profile C — Signature restaurant in a listed building, prime central London

  • Around 4,800 sq ft over ground and lower ground, listed building consent required

  • Bespoke joinery throughout, chef's counter, specialist lighting and acoustics

  • Fit-out: approx. £1,900,000 (about £396/sq ft blended)

  • Kitchen equipment: approx. £260,000 · FF&E: approx. £280,000

  • On site: 28 weeks

You can see completed Kapeti hospitality work — including Efes Premium Wimbledon and Efes Richmond — on our Commercial Projects page.



11. HOW TO SENSE-CHECK A RESTAURANT FIT-OUT QUOTE

Five checks before you sign:

  1. Is the kitchen infrastructure included, or only the dining room? Extraction, suppression, gas and drainage are sometimes excluded or left as provisional sums.

  2. How much sits in provisional sums? More than 15% of the total means the real price is still unknown.

  3. What are the assumptions? "Subject to existing extraction being adequate" can be a six-figure sentence.

  4. Is there a contingency? Under 5% is unrealistic for a restaurant.

  5. Does the programme match reality? A mid-size restaurant is typically 14–22 weeks on site. A much shorter programme usually means overtime claims later. See Restaurant Fit-Out Timeline in London.



12. FREQUENTLY ASKED QUESTIONS


How much does a restaurant fit-out cost in London in 2026?

Customer areas typically cost £180–£450 per sq ft and kitchens £400–£1,000+ per sq ft. Blended across the unit, most London restaurants cost £220–£400 per sq ft. A mid-size 2,500–3,500 sq ft restaurant usually lands between £500,000 and £1.2M for the fit-out alone.

What is the cost per square foot of a restaurant fit-out?

Casual: £220–£300 blended. Mid-market: £260–£350. Premium neighbourhood: £320–£420. Signature and fine dining: £450–£750+. These exclude kitchen equipment, loose furniture, fees and VAT.

How much does a restaurant kitchen cost to fit out?

Kitchen infrastructure — extraction, suppression, gas, drainage and finishes — costs £400–£1,000+ per sq ft. Equipment is usually separate: £80,000–£180,000 for a full 70–120 cover kitchen, and £150,000–£400,000+ for high-output or charcoal and wood-fired kitchens.

Why do restaurant fit-out quotes vary so much?

Because of scope, not efficiency. Differences usually come from whether kitchen infrastructure is included, how much is left in provisional sums, the assumptions about existing services, and specification level. Compare like for like before comparing totals.

Is it cheaper to take over an existing restaurant?

Often, yes — if the existing extraction, gas and drainage genuinely suit your concept. A suitable second-hand restaurant premises can save £100,000–£250,000 against a bare shell. If the services do not suit, much of that saving disappears, so survey before signing.

How much does extraction cost for a restaurant?

Upgrading existing extraction can cost £15,000–£50,000. A new riser to roof level typically costs £40,000–£150,000+, depending on building height, route and planning. In some buildings a new route is not permitted at all.

Can a restaurant be fitted out without gas?

Yes. All-electric kitchens are increasingly common in London, especially where landlords no longer permit gas. They usually need a significant electrical upgrade, and some cooking styles — charcoal, wood-fired, wok — are harder to replicate.

How much is restaurant furniture and FF&E?

For a mid-size restaurant, loose furniture, tableware and glassware typically run £40,000–£120,000. Bespoke fixed seating and banquettes are normally part of the fit-out joinery.

Does the fit-out cost include VAT?

Usually not. VAT at 20% applies to most fit-out work and is normally quoted separately. On a £700,000 fit-out that is £140,000.

How long does a restaurant fit-out take?

A mid-size restaurant is typically 14–22 weeks on site, with a further 8–14 weeks beforehand for design, surveys, approvals and procurement.

Is design and build cheaper for a restaurant?

Typically 10–15% cheaper on total project cost, because design, kitchen and construction are coordinated by one team and variation claims between separate parties disappear. It also gives far better programme certainty.

Can you give me a cost for my specific unit?

Yes. Send us the unit details, floor plan or photos and your concept, and we will give you a realistic range and the key risks — usually within 48 hours of a site visit. The first conversation is free.



13. WHAT TO DO NEXT

If you are looking at a restaurant unit, have just signed a lease, or are refurbishing an existing restaurant, the most useful first step is an honest conversation about your unit, your concept and your budget.

We will review the unit — ideally before you sign — check the extraction, gas, drainage and power, and give you a realistic fit-out range and programme. No commitment, no pressure.

Kapeti is a BIID registered design and build practice based in Kensington and Chelsea. We deliver restaurant, bar, pub, hotel and hospitality interiors across London, with commercial kitchens as a core specialism and bespoke joinery produced through our manufacturing partners.



Planning opening a restaurant in London ? The first conversation is free.


One team. One contract. No handovers. No surprises.The first conversation is free. No cost, no obligation.

📲 WhatsApp: +44 7342 240695✉️ Email: design@kapeti.com🌐 Website: kapeti.com





RELATED INSIGHTS


SERVICE PAGES

Servet Yuksel is a BIID Registered Interior Designer and Managing Director of Kapeti Interior Architecture, a design and build practice based in Kensington and Chelsea, London. Kapeti delivers restaurant, bar, pub, hotel and hospitality fit-outs across London, with commercial kitchens as a core specialism and bespoke joinery produced through manufacturing partners in Türkiye, Portugal and Poland.






 
 
 

Comments


© 2026 by KAPETI LTD. Company Number 12312588  (Registered in England and Wales).   TR     /  عربي

  • Pinterest
  • Instagram
  • LinkedIn
bottom of page